← Back to maxxinfra.in

Quick Steel Estimate

A rough tonnage and cost range in seconds — no 3D configuration needed. For an interactive design, use the full Project Estimator.

Approx. steel
Approx. cost

Very rough order-of-magnitude estimate only, based on typical kg/m² benchmarks for the selected building type — actual tonnage depends heavily on span, bay spacing, wind/seismic loads, and crane capacity. Excludes cladding, erection, foundation & GST.