Plan your steel building with engineering-grade tools
Free calculators, lookups and checklists built from the codes we design to and the tonnage we have delivered — for consultants, architects, plant engineers and procurement teams.
Wind & seismic parameters by city or PIN
IS 875 basic wind speed, IS 1893 seismic zone, terrain-category factor, design wind pressure and the effect on steel weight for any Indian site.
Open the lookup →Steel tonnage benchmark sheet
Delivered kg/m² from MAXXINFRA projects and planning benchmarks by span, eave height, crane duty and wind zone. “How much steel will my building need?”
See the benchmarks →PEB vs RCC comparison
Superstructure cost, construction time, load on foundations and expandability for your area and span — with every assumption editable.
Compare now →Site-readiness checklist for steel erection
Foundations, anchor bolts, crane access, power, laydown, safety and sequencing — 45 checks before the first column goes up.
Open the checklist →Vendor pre-qualification pack
Facility, machinery schedule, quality & NDT, HSE, manpower and FY 2025-26 supply references — sent automatically to your corporate email.
Request the pack →3D project estimator
Configure span, length, eave height, cranes and cladding in 3D and get an indicative tonnage and budget.
Configure in 3D →Quick steel estimate
Enter built-up area and building type for a rough tonnage and cost range — no configuration needed.
Estimate now →Exterior colour studio
Try roof and wall cladding colour schemes on a PEB elevation before you specify.
Open the studio →3D project tours
Walk through the multi-span crane sheds, 93.8 m curved-roof buildings and hospital frames we have delivered.
Take a tour →Why we publish these tools
Most steel-building decisions are made weeks before a fabricator is called — when a consultant is sizing foundations, an architect is checking whether a 40 m clear span is realistic, or a procurement team is shortlisting vendors. These tools put the numbers we work with every day in front of you at that stage: the IS 875 and IS 1893 parameters that drive the design, the kg/m² we have actually delivered on crane sheds and curved-roof buildings, and the site conditions that keep an erection programme on schedule.
Every calculator states its assumptions and lets you change them. None of them replaces a structural design — when you are ready for one, each tool ends with a route to our engineering team, who return a preliminary frame scheme and tonnage within 24–48 hours.
Built on delivered work
The benchmarks come from 20,000+ MT of delivery experience across process buildings, heavy-crane workshops, curved raw-material sheds, warehouses and institutional frames — including a 17,289 m² multi-span PEB complex with 25 + 10 MT EOT cranes at 81.3 kg/m², three curved-roof buildings with a 93.8 m clear span at 55.7–63.4 kg/m², and a 24.7 m clear-span hangar at 68.8 kg/m². See the project portfolio.